A Mythical Man Month Corollary Conversation
(A conversation that happened with another developer. Lightly edited to protect the innocent. Also, there may be typos and grammatical errors, since it is copied pretty directly from an IM thread.)
K: I can sit here and think that 100 man developer teams have as their sole advantage over 5 man developer teams that they build systems that can only be maintained by a 100 man developer team…but I have no proof of that, and we already have such a system, so what can I do?
(I really do think that…it can’t be accurate at the limits, but it’s marginally true at some wide range that the only thing long-term gained by adding a developer is that they will help you produce the same system that only an n+1 developer team can maintain.)
A lot of successful businesses disagree with me, so maybe I’m wrong…but it feels true. Throw 5 devs at a problem and they will solve it perfectly well with a system that can be maintained by 5 devs. Throw 100 devs at the same problem, and they will solve it just about as well (probably worse) with a system that only 100 developers could maintain.
C: “…Sole advatnage over 5 man developer teams…” advantage here is sarcastic in light of your last message?
K: Well, it’s an advantage if you are the other 95 devs. :)
C: Ah, yeah.
K: (And it’s not an elitist thing. I’m assuming pick any 5, as long as they are broadly competent.)
C: That’s thought provoking. Hadn’t put much thought into it.
K: Isn’t that a large part of the point of the Mythical Man Month?
C: Seems like it’s a natural corollary: More people past a point increases the communication factor to the point that no net speed is gained. Mm… More people past a point increases the communication factor by such a degree that no net speed is gained. (Just rephrased it)
K: And you solve that by…building systems that simplify the communication network.
C: Right, which can only be maintained by 100 developer teams.
K: Yeah
C: Because the complexity has to go somewhere. You haven’t gotten rid of it, really. You’ve streamlined operating with 100 man teams.
K: The 5 man team would have built a monolith.
C: Interesting. Functional or actual? You can partition the problem sensibly, similar to what our last whiteboarding session suggested. It’s going to get treated as a monolith, but kinda has pieces.
K: Actually, though you bring up a good point. I’m getting at something but I’m fuzzy on it. The 100 person team divides up into 20 5-man teams and each builds a component that is a black box to everyone else, and has its own complexity (its own database, its own protocols, its own coding structure). So a single 5 man team trying to wrap their heads around the system have to deal with 20 databases, 20 coding styles, maybe 20 different languages.
C: Potentially 40ish: Usually you have a primary one and then some scriptwork for deployment.
K: But, of course, the 5 man team would break the monolith up into components, but components they can understand. That are organized into a holistic whole. The 100 man team, to solve the communication complexity problem, shifts it into the infrastructure of the system, which allows them to work, but also makes a system that only a 100 man team could maintain. Now, here’s the rub. What if you have a ~100 man team…but they didn’t build a 100 man system. They took architectures from Netflix, Google, Amazon for granted as “best practice” and built a system for a 10,000 man team.
C: Oh, yeah.
K: And then you are a 5 man team trying to interact with it…